OAO Kaindy-Kant
The Kaindy-Kant project concerns equipment that participates in the plant heat scheme and supports stable process conditions in sugar production.
- Location
- Kyrgyzstan
- Year
- 2025
- Type of work
- Evaporation station equipment

2025
project year
OVC-NP
key apparatus
5.2 x 24.7
equipment size
What was done
- Selected equipment for the production-section parameters.
- Prepared project solutions for the OVC-NP unit and mixer.
- Aligned delivery requirements with modernization of an operating sugar plant.
Result
- The project formed a technical basis for section modernization with regard to plant parameters.
- The equipment was prepared as part of an integrated production-line solution.