RusAgro Tambov

The project focused on improving the stability of the production section under high load and aligning new equipment with the existing plant infrastructure.

Location
Tambov Region
Year
2023
Type of work
Production section modernization
Project photo RusAgro Tambov

2023

implementation year

1

modernized section

100%

integration with the existing line

What was done

  • Survey of the operating line and documentation of site constraints.
  • Supply and adaptation of equipment to existing production processes.
  • Supervised installation, start-up and operating-mode checks on the line.

Result

  • The section received a more stable process configuration for seasonal load.
  • The equipment was commissioned without changing the core operating logic of adjacent lines.