Rusagro Tambov, Znamensky Sugar Plant
For the Znamensky Sugar Plant, BMA prepared technical documentation required for section modernization and integration into the operating process scheme.
- Location
- Tambov Region, Russia
- Year
- 2024
- Type of work
- Design and working documentation

2024
project year
2
documentation packages
operating plant
implementation context
What was done
- Collected source data and reflected constraints of the operating production site.
- Developed design documentation for reconstruction.
- Prepared working documentation for subsequent implementation stages.
Result
- The customer received a technical documentation package for planning and executing reconstruction.
- The design solutions were prepared with regard to the plant's existing infrastructure.